> Login

KSEBL - Cost data of Distribution works - 2024

 

KERALA STATE ELECTRICITY REGULATORY COMMISSION

ORDER IN OP No 36/2023 dated 8/2/2024

Approved Cost Data of distribution works for KSEB Limited

Sl.No

Description of the work

Rate approved by the Commission in Rupees

1

Providing support pole for weather proof service connection

7547

2

Post insertion for LT single phase overhead line (without stay)

8563

3

Post insertion for LT single phase overhead line (with stay)

11706

4

Post insertion for LT single phase overhead line (with strut)

16455

5

Post insertion for LT three phase overhead line (without stay)

9365

6

Post insertion for LT three phase overhead line (with stay)

12508

7

Post insertion for LT three phase overhead line (with strut)

17257

8

Shifting Single Phase Energy Meters

909

9

Shifting Three Phase Energy Meters

1195

10

Shifting Three Phase CT Meters

1792

11

HT pole insertion in HT/LT line (with stay)

18608

12

HT pole insertion in HT/LT line (with strut using 8m pole)

22208

13

Providing strut using LT pole

7892

14

Providing strut using HT pole

10154

15

Providing LT stay

3143

16

Providing HT stay

4293

17

Adding one conductor (ACSR Rabbit) on the existing poles (where cross arm is not available) inclusive of cost of pin, insulator etc.

82 (per metre)

18

Conversion of 1km LT single phase 2 wire line to LT Three phase 4 wire line

180 (per metre)

19

Conversion of 1km LT single phase 2 wire line to LT Three phase 5 wire line

258 (per metre)

20

Conversion of 1km LT single phase 3 wire line to LT Three phase 5 wire line

188 (per metre)

21

Drawing 1km LT OH Line on existing poles 2 wire ACSR Rabbit

156 (per metre)

22

Drawing 1km LT OH Line on existing poles 3 wire ACSR Rabbit

229 (per metre)

 23

Drawing 1km LT OH Line on existing poles 4 wire ACSR Rabbit

287 (per metre)

24

Drawing 1km LT OH Line on existing poles 5 wire ACSR Rabbit

377 (per metre)

25

Constructing 1km LT OH Line 2 wire with Rabbit using PSC Poles

487 (per metre)

26

Constructing 1km LT OH Line 3 wire with Rabbit using PSC Poles

562 (per metre)

27

Constructing 1km LT OH Line 4 wire with Rabbit using PSC Poles

634 (per metre)

28

Constructing 1km LT OH Line 5 wire with Rabbit using PSC Poles

718 (per metre)

29

Constructing 1km 11kV OH Line with ACSR Raccoon using PSC Poles

966 (per metre)

30

Constructing 1km 11kV line with UG Cable 300 sqmm by open trench 

2657 (per metre)

31

Constructing 1km 11kV OH Line with ACSR Raccoon using A type Poles

1500 (per metre)

32

Installation of 1 No. 11 KV/ 433 V, 100 KVA Transformer without stay (pole mounted)

*490575

33

Installation of 1 No. 11 KV/ 433 V, 160 KVA Transformer without stay (pole mounted)

*624092

 34

Installation of 1 No.11 KV/ 433V, 250 KVA Transformer

*810265

35

Installation of Data Acquisition compatible

Extensible type Ring Main Unit without VCB -CCC

(E) (Cable -Cable -Cable)

 *847800

36

Installation of Data Acquisition compatible

Extensible type Ring Main Unit with VCB -CTC (E)

(Cable -Transformer -Cable)

*891215

37

Installation of Data Acquisition compatible

Extensible add-on type Ring Main Unit without VCB (Single Switch C-Extension) 

429904

38

Installation of Data Acquisition compatible,

Extensible, add-on type Ring Main Unit with VCB

(Single Switch T-Extension) 

561411

39

Installation of Data Acquisition compatible

Extensible type Ring Main Unit with provision for isolation and earthing facility on both sides (gCCg) 

*536546

40

Drawing 1km of HT ABC of size 3X150 + 1X120 sq mm using 9 M PSC Poles

2188 (per metre)

41

Drawing 1km of HT ABC of size 3X120 + 1X95 sq mm using 9 M PSC Poles

2005 (per metre)

42

Drawing 1km of LT ABC of size 3X70 + 1X50 +1X16 sq mm using 8 M PSC Poles 

819 (per metre)

* Estimated cost does not include cost of fencing and construction of yard




Views: 17349.